Change order design document
How we can change size of "{{ p.image }}" from order summary ?
Thanks
Change order design document
How we can change size of "{{ p.image }}" from order summary ?
Thanks
It depends on the "Admin panel: product mini-icon thumbnail width" and "Admin panel: product mini-icon thumbnail height" settings (Settings -> Thumbnails)
It depends on the "Admin panel: product mini-icon thumbnail width" and "Admin panel: product mini-icon thumbnail height" settings (Settings -> Thumbnails)
I see this
But we can change size separate ?
Admin panel to remain small, and i want on order summary to be more big
one css or html tweak ?!
Yes, it can be changed directly in the code
app/Tygh/Template/Snippet/Table/ProductVariable.php
replace
Registry::get('settings.Thumbnails.product_admin_mini_icon_width'), Registry::get('settings.Thumbnails.product_admin_mini_icon_height')
with
200, 200
and clear cache
(!) Not tested
Yes !
Works
Thanks
You are welcome!