Thanks a lot now it is clear.
Nice work - thanks for sharing the addon!
Thanks so much for sharing this addon, which is exactly what I have been looking for today.
The Read Me file is empty. Please could you explain exactly how to install the addon?
Thank you!
Charles
Hello.
This is a standard installation.
unpack, copy to shop and install from administration panel.
good luck.
Robert.
Hi Robert
Thank you for getting back to me. I installed the addon and it works perfectly, thank you!
I'm new to this and wanted to check that I had done things correctly:
- Unpacked the tgz on my local machine.
- Using WinSCP, I dragged and dropped the two 'order status' folders to the 'addons' directories of 'app' and 'design/backends/templates'
- I installed the addon using the admin area
Was that correct? I didn't know if there were any permissions changes that needed to be made?
Thank you for your help!
With best wishes
Charles
[quote name='Charles' timestamp='1395225561' post='179580']
Hi Robert
Thank you for getting back to me. I installed the addon and it works perfectly, thank you!
I'm new to this and wanted to check that I had done things correctly:
- Unpacked the tgz on my local machine.
- Using WinSCP, I dragged and dropped the two 'order status' folders to the 'addons' directories of 'app' and 'design/backends/templates'
- I installed the addon using the admin area
Was that correct? I didn't know if there were any permissions changes that needed to be made?
Thank you for your help!
With best wishes
Charles
[/quote]
Hello.
This this is the correct procedure. I'm glad that everything works well.
Regards
Robert Diak
Hello.
This is addon for version 4x.
Regards
Robert Diak
Dear Its not working with cs cart multi vendor 4.3.6 :-( :-(